Each Nutrient Separating Baffle Box is custom designed to meet storm drain position-specific hydraulic and geometric requirements. To ensure an efficient flow of information during design, accommodate project scheduling and enhance installation speed, we use the following guidelines:
Design Input: Price & Company requests the Project Designer submit a Design Worksheet via email or fax (616.530.2317). This easy-to-complete form provides critical information from which Suntree Technologies designs a NSBB unit suitable for the site conditions and performance requirements. Important information to be transmitted includes:
- Project information, including Project Designer contact information,
- Proposed location of NSBB,
- Grade elevation at the NSBB location,
- Inlet pipe type, size and invert elevation (multiple pipes may be used),
- Outlet pipe type, size and invert elevation (again, multiple pipes may be used),
- Peak Treatment Flow: typically taken as a 'pipe full' flow, but may refer to a 'pressurized pipe-full' flow or any other maximum flow rate anticipated or mandated by regulation.
- Peak Treatment Flow at 80% TSS Reduction Efficiency: this may not be known or may be a regulated flow rate.
So that Price & Company can be as thorough as possible, we request that a Project Plan Sheet, indicating the proposed NSBB location, be provided as well. DWG, PDF [emailed or mailed] or fax formats are suitable.
Design Plan & Specification Preparation: From the information provided on the Design Worksheet, Suntree Technologies prepares CAD plans and specifications which detail the input information, NSBB system geometry, hydraulic characteristics and contaminant removal capabilities. Price & Company submits these completed documents to the Project Designer, typically within 3-5 working days, for his or her review, comments or direct inclusion into the Project Plans. A sample of a completed Suntree Technologies Plan and Spec may be viewed by clicking here. While the example is in a letter-sized format, project Plans & Specs will be sent in standard ARCH D format [24" x 36"]. There is no charge for these design services.
Design Approval: Prior to fabrication of a NSBB unit, Price & Company must receive an 'Approved' (signed and dated) Suntree Technologies Plan & Specs. If electronically 'Approved', please email the completed file to Price & Company. If sent by mail or courier, please provide two (2) 'Approved' copies. Typically, this process occurs after a project 'award' and is completed via the contractor of record.
Project Scheduling: Typically, a 3 to 6 week lead time is required between order placement and NSBB delivery.
Please contact your Regional Representative for further information regarding theNSBB design service procedures.