Stormwater Clarification

This table highlights stormwater clarification completed during the construction process, i.e., the removal of suspended solids from collected stormwater prior to its off-site discharge.  The Related Topics box provides additional Case Files associated with during-construction process water clarification.  The technologies illustrated within both sets of Case Files are similar and useful for post-construction operations as well as industrial process water quality improvement. 

 Name Product  Description

Big Rock
Point Restoration
 

Floc Logs
703d-706b
Duplex

Site Dewatering & Storm Drain Clarification
Decommissioning of the Nation's third oldest nuclear power plant includes complete site restoration … beginning with the removal of all structures and impacted soils.

 Eastwood Towne
Centre

 Floc Logs
702b

Storm Drain Clarification
Eastwood Towne Centre is destined to be Lansing's focal point for retail shopping and restaurant services. By the end of 2002, its 192 acres will host such mega stores as Sam's Club, Wal-Mart, an NCG 18 theater cinema and the…

 Medical
Facility

 Floc Logs
703d-706b Duplex

Site Dewatering
A water clarification system using APS 703d and 706b Floc Logs, at a congested urban site, enabled direct discharges of treated dewatering and storm waters into a storm drain system, significantly reducing treatment expenses and scheduling difficulties ...

 O'Hare International Airport

 Floc Logs 706b

Sediment Basin Water Clarification
Massive earth moving operations create large areas of exposed soils ... often for extended periods. The City of Chicago OMP’s upgrading at O’Hare International Airport proved to be no exception ... 

 Soldier
Field

 Floc Logs
704b

Site Dewatering
Rehabilitation of Soldier Field began, literally, the moment the whistle blew signaling the end of the Bear's 2001-2002 season. Planned demolition removed everything but the outer facade walls and adjoining…

 Wal-Mart

 Floc Logs
706b

&
Silt Stop
705

Sediment Basin Water Clarification
APS 706b Floc Logs provide a solution to high-turbidity storm water runoff from impacting sensitive environmental wetlands and water bodies. A large sediment basin proved inadequate to properly reduce suspended solids...